01
Project information
These details help the KsT team follow up with you.
02
Design assumptions
Change these preliminary assumptions if you have a specific requirement.
03
Appliance / load audit
Mark loads that are expected to operate simultaneously during the design peak. Mark continuous loads separately.
| Appliance | Qty | Rated W | Hours/day | Surge × | Peak? | Continuous? | Use | Energy | Peak W |
|---|
Daily energy0.00 kWh
Connected load0 W
Continuous load0 W
Estimated peak0 W
04
Generate preliminary results
Review your entries, then generate and submit the assessment to KsT.
05
Preliminary system results
These figures are estimates for discussion with the KsT technical team.
Calculation basis
Send this assessment to KsT
Final engineering review required. The result does not constitute a final design, quotation or guarantee of performance. KsT may revise equipment ratings, PV string configuration, battery size, inverter size, cable sizes and protective devices after technical review.